mining

How robust strategic planning reduces project investment risk

Creating value through mining project investment

A mining project investment is the allocation of capital to develop, expand, acquire, or operate a mineral asset with the objective of creating value for the investing company.

In the case of a development or expansion project, this investment is typically deployed progressively throughout the study and project development process, culminating in the major capital commitment required for construction and commissioning. The value generated by the investment may be measured through a range of financial, strategic, environmental, and social outcomes, including net present value (NPV), cash flow generation, capital efficiency, sustainability performance, and socio-economic benefits. Consequently, the preferred investment strategy for a mineral asset is not necessarily the one that maximizes NPV, but rather the one that best aligns with the company's overall objectives, stakeholder expectations, and risk appetite.

Every investment carries risk

Project investment risk is the likelihood that a mining project will fail to deliver the outcomes expected from the chosen investment strategy. This may result in lower-than-expected returns, delayed value realization, failure to achieve strategic or sustainability objectives, or, in the most severe cases, a loss of invested capital. A thorough evaluation of project risks is therefore essential to ensure that the level of risk associated with the investment is consistent with the risk appetite of the investing company.

mining site

Mining projects mainly fail to deliver expected outcomes due to incorrect assumptions and inadequate risk assessment

As discussed by Peter McCarthy1, mining projects typically fail when key technical, non-technical, and financial assumptions used in their evaluation are incorrect, or when project risks are inadequately identified, assessed, or managed, causing actual outcomes to differ materially from those anticipated when the investment decision was made.

Technical assumptions include the understanding of the orebody, geotechnical and hydrogeological conditions, metallurgical recovery, mineral processing performance, ore loss and dilution, and the level of technology adoption. Financial assumptions include capital and operating costs, commodity prices, and other economic parameters. Non-technical assumptions are often associated with permitting, environmental, social, regulatory, and stakeholder-related risks.

Incorrect assumptions and inadequately assessed risks are often the result of governance gaps and shortcomings in project execution. Common contributing factors include optimism bias, accelerated studies due to budget or schedule constraints, weak stage-gate discipline, failure to periodically review and challenge key assumptions and expectations as new information becomes available, failure to adopt and adhere to recognized Mineral Resource and Ore Reserve reporting codes, a lack of independent review and challenge, and inexperienced project teams. In particular, accelerated studies can have a significant impact on project outcomes, as they often limit the time available to properly assess uncertainties, evaluate alternatives, and identify risks before major capital commitments are made.

Mining studies progress through a structured sequence from concept evaluation to project execution: scoping study, pre-feasibility study, and feasibility study, culminating in a final investment decision and implementation. As the study level advances, project definition improves, confidence in the financial outcomes increases, and risk and uncertainty are progressively reduced. Each stage builds knowledge, progressively reduces uncertainty, and establishes the foundation for the next. Skipping or rushing a stage increases the likelihood that key investment decisions are made with insufficient information and incorrect assumptions.

Mining

We assist clients at every stage of a mining project

Based on our industry domain knowledge, we can help clients at every step and in any scale of a mining project. Starting from geology and exploration planning, as well as environmental permitting, long before the actual mining activity can begin, all the way to mine closure and environmental monitoring.

Robust strategic mine planning improves the likelihood of success

An important component of mining studies is mine planning. Mine planning supports all levels of study, with strategic mine planning playing a critical role during scoping and pre-feasibility studies, where key development alternatives are identified, evaluated, and compared. While more detailed planning is undertaken during feasibility studies and project execution, strategic mine planning remains important to ensure that project development, operational decisions, and future investment choices remain aligned with the original investment objectives and continue to maximize value as new information becomes available.

At the scoping study stage, strategic planning provides a high-level assessment of the project's economic potential and enables the evaluation of alternative development scenarios. During pre-feasibility studies, it helps refine key project parameters such as mining rate, processing throughput, processing route, mining method, and equipment selection, enabling the identification of a preferred development strategy for advancement to feasibility study. Where key assumptions or project inputs have changed significantly, it is good practice to revisit and update pre-feasibility outcomes before commencing feasibility work to confirm that the selected option remains robust and appropriate.

When strategic mine planning is rushed or substandard, the option advanced to feasibility study may not represent the most effective strategy for achieving the investing company's objectives. Consequently, the project may be more exposed to adverse changes in key assumptions and uncertainties, increasing the likelihood that it will fail to deliver the expected investment outcomes. A more comprehensive strategic planning process may have identified an alternative development strategy that offered greater value, improved resilience to uncertainty, and stronger alignment with the company's objectives, risk appetite, and investment criteria.

What robust strategic mine planning looks like

Robust strategic mine planning begins with a clear understanding of the investing company’s objectives, value drivers, risk appetite, and capital constraints.

As defined by Flanagan et al2, the agreed strategic context is used to identify a diverse range of opportunities, then converged to define and frame priority opportunities to be further evaluated in consultation with stakeholders, depicted in Figure 1.

xx
Figure 1. Strategy objective alignment

Alternative development strategies that align with these objectives should be systematically evaluated rather than prematurely focusing on a single deterministic option. This involves testing a range of mining methods, mining rates, processing throughputs, cut-off grades, equipment fleets, technology options, processing routes, and mine development sequences to understand the trade-offs between value and risk. The process should identify the key project value drivers, uncertainties and risks, while integrating inputs from geology, geotechnical, hydrogeological, metallurgy, processing, infrastructure, environmental, social, and financial disciplines to avoid siloed decision-making. Potential development strategies should be stress-tested through sensitivity and scenario analysis under less favourable conditions to assess their resilience, and all key assumptions and conclusions should be subjected to rigorous peer review and challenge. The outcome is a development strategy that is economically attractive, but also robust, resilient, and aligned with the company's investment objectives.

Strategic mine planning at AFRY

At AFRY, we provide proven integrated approaches to strategic mine planning, combining multidisciplinary technical expertise with experienced project management to coordinate the many specialist teams involved in mining studies. Being independent of software companies and service providers, our experts use a range of advanced mine planning tools, carefully selected to ensure an appropriate fit-for-purpose with the level of assessment.

Our strategic planning process typically begins with engagement workshops involving key project stakeholders. These workshops are designed to establish the objectives of the investing company, identify the development alternatives that should be considered, and define the scenarios to be evaluated. Preliminary mine planning work is often completed beforehand to provide a robust technical basis for the discussions and ensure that scenario selection is informed by realistic project opportunities and constraints.

For open pit operations, strategic mine planning involves generating multiple inventory sets through pit optimization and the development of associated pit and stage limits. These inventories are then evaluated through a range of schedule scenarios to test alternative mining rates, processing rates, cut-off grade strategies, stockpiling approaches, mining sequences, and other project constraints. Strategic scheduling is undertaken using an NPV-maximizing scheduling tool based on a mixed-integer linear programming (MILP) model, which identifies development strategies that maximize project value while satisfying practical operating constraints. Where the client's objectives extend beyond NPV maximization, the optimization framework can be adapted so that the selected strategy fulfills those objectives while still seeking to maximize value. When the strategic planning exercise reaches a sufficient level of maturity, cost models are developed using AFRY's proprietary OPMincost methodology, providing a consistent basis for evaluating and comparing alternative development strategies.

For underground operations, the process similarly begins with strategy workshops prior to the generation of multiple inventory sets to test a range of alternative mining methods, materials handling options, stope geometries, and cut-off grade strategies. Because underground mine design and infrastructure development require significantly more engineering effort than open pit studies, the workshop phase typically narrows the evaluation to two or three priority scenarios for detailed assessment. These scenarios are then developed through mine design, scheduling, and cost modelling. Where appropriate data is available and the project strategic options are sufficiently large or complex, AFRY often recommends evaluating a broader range of alternatives. Our Hill of Value® methodology allows a much larger number of scenarios to be assessed efficiently, helping to identify value drivers and opportunities that may otherwise remain undiscovered.

The Hill of Value® methodology is particularly valuable for projects that include both open pit and underground mining assets. Optimizing these assets as an integrated mining system is often difficult and time-consuming because there are no commercially available tools capable of simultaneously optimizing both mining methods within a single framework. The methodology provides a structured process for systematically evaluating alternative integrated strategies and identifying solutions that maximize the overall value of the mineral asset.

Figure 2 presents an example of the results from a Hill of Value® analysis, where NPV (the client's primary objective in this case) is evaluated across changes in two selected value drivers: production rate and cut-off grade. Similar analyses should also be undertaken for other relevant value drivers. While identifying the combination of parameters that maximizes value at the peak of the hill is important, it is equally important to understand the shape of the hill and how value responds to changes in the underlying assumptions. This provides insight into the robustness of the selected strategy and helps identify the range of conditions under which the project continues to deliver strong outcomes.

Example of Hill of Value® analysis
Figure 2. Example of Hill of Value® analysis

As mining projects become increasingly complex and capital-intensive, and technological advances challenge traditional approaches, robust strategic mine planning is more important than ever. By evaluating the right alternatives, quantifying uncertainty, and aligning development strategies with business objectives, mining companies can make better-informed investment decisions and improve the likelihood of project success. AFRY combines specialist technical expertise, advanced optimization tools, and proven methodologies to help clients identify and evaluate development strategies that deliver these outcomes. Contact us to discuss how we can support your next project.

Mine tailing piles reflected in surface water

AFRY offers a sustainable mining approach

Mining is a key enabler for the clean energy transition. We deliver a full range of consulting and engineering services to help mining and metals companies shape and develop their ideas and concepts into technically, financially, and environmentally sound solutions.

Footnotes

  • 1. McCarthy P, 2013. Why Feasibility Studies Fail. https://www.amcconsultants.com/experience/why-feasibility-studies-fail a↩
  • 2. Flanagan M, Pelech T, Grobler F, Barros N. Technical Evaluation of Open Pit to Underground Transition Using Integrated Optimisation Methods. Proceedings of Iron Ore and Open Pit Operators Conference June 2026, The Australian Institute of Mining and Metallurgy, 2026. a↩