Hydraulic Modelling for the Oberaudorf/Ebbs Hydro Power Plant in Austria
Hydraulic modelling and calculation of flood risk
AFRY Austria performed hydraulic modelling of the Inn River for the Oberaudorf Ebbs HPP. Because of the high sediment transport of the Inn River, a model including sediment transport was chosen. The roughness co-efficiency was defined by the authorities.
During the Final Acceptance Tests for the Oberaudorf Ebbs HPP, calculations for the flood risk were required.
In advance steady state modelling by use of WASPI 2.6 was carried out. The main task of the project, the quasi steady state modelling including sediment transport, was done by use of the software GSTARS.
Scope of Work
The model of the storage was de-signed and later on used for the calculation of high floods and theoretical floods. The calculations were used as well for adapting the operation rules for the HPP and for procedures for possible future floods.
Project facts
Client: Grenzkraftwerke GesmbH
Services:
- Hydraulic Modelling - Steady State (WASPI 2.6)
- Hydraulic modelling - quasi Steady state including sediment transport (GSTARS)
- Adaptation of the HPP operation
- Check of flood risk management
Project period: 2002 - 2004
Location: Austria