Replacing aging infrastructure to strengthen Sweden’s power system
Sweden’s transmission grid is undergoing a major renewal. Through Inlandspaketet, Svenska kraftnät is replacing aging infrastructure with two new 400 kV transmission lines spanning approximately 350 km in northern Sweden, helping strengthen grid reliability and increase transfer capacity to meet future electricity demand. AFRY supports the project with engineering and consulting services from planning and design through construction support and commissioning.
Renewing Sweden’s aging transmission grid
Sweden’s transmission network enables reliable power flows between regions and helps secure the country’s electricity supply. Much of this infrastructure was built decades ago, and parts of it are now approaching the end of their technical lifespan. Renewing these assets, while increasing transfer capacity at the same time, is key to building a robust power system that can meet Sweden's future electricity needs.
Svenska kraftnät is meeting this challenge through Inlandspaketet, a project that renews and strengthens the transmission grid. It replaces aging 220 kV infrastructure with two new 400 kV transmission lines between Kilforsen and Fallviken in northern Sweden, while approximately 500 km of existing transmission lines that have reached the end of their technical lifespan are planned for decommissioning. The upgrade is expected to increase transfer capacity, improve reliability and create a more resilient grid that supports secure and efficient electricity transmission between regions.
AFRY’s transmission engineering scope
Delivering a project of this scale requires expertise across engineering, environmental planning, permitting and stakeholder coordination. AFRY supports Svenska kraftnät with integrated consulting and engineering services that help move the project efficiently from planning through implementation.
By bringing together specialists in transmission engineering, environmental services, permitting, GIS, land access and technical investigations, AFRY helps reduce project complexity and support informed decision-making. This integrated approach helps streamline project development, reduce interfaces between disciplines and support efficient delivery of a large and technically complex transmission infrastructure project.
The assignment includes:
- Project planning and coordination
- Permitting and environmental services: environmental impact assessments (EIA/MKB, miljökonsekvensbeskrivningar), consultations, concession applications and regulatory approvals
- Route development and engineering design: GIS-supported analysis, geotechnical and hydrogeological investigations, and detailed transmission line design
- Construction preparation: procurement documentation, production planning and construction logistics
- Decommissioning planning: environmental assessments and permitting for approximately 500 km of existing transmission lines
- Land access services: stakeholder engagement and agreements with landowners and authorities
Construction support and commissioning
Inlandspaketet requires close collaboration across engineering, environmental services, permitting, and digital delivery. Bringing these capabilities together in one coordinated approach helps us support Svenska kraftnät throughout the project lifecycle and deliver a stronger, more reliable transmission network.
Nora Kronvall, Group Manager, Transmission Lines, AFRY
Digital support for transmission line delivery
The development of large-scale transmission infrastructure involves extensive engineering, environmental and spatial data. AFRY applies digital tools and shared project environments to support collaboration, improve information management and support efficient coordination across project teams.
This approach supports route development, design coordination and efficient collaboration across disciplines while maintaining consistency throughout planning, design and implementation.
Inlandspaketet’s role in the NordSyd initiative
Inlandspaketet forms part of NordSyd, Svenska kraftnät's largest transmission grid investment program and a long-term effort to renew aging infrastructure and strengthen Sweden's national grid. NordSyd includes investments of approximately SEK 100 billion and is expected to continue through the late 2030s.