AFRY's Hill of Value® process helps Canadian Base Metals miner unlock near-term mining opportunities
The Hill of Value® process and approach to full system optimization have significantly supported our client's operations by helping them achieve a more dynamic and flexible cut-off grade application to mine near-term opportunities and contingency production. This has helped them close the current performance gap through a more robust Life of Mine (LOM) strategy.
Revitalizing aging underground operations
Our client's Canadian Base Metals operations are some of the oldest and deepest underground open-stoping operations globally. Highly seismic mining conditions, ageing underground infrastructure, and slow development rates have led to:
- A drop in overall production
- Excess system capacity
- Increase in mine operating costs over the last 20 years
The application of break-even style cut-off grades resulted in increasing cut-off grades in each of the mines as operating costs continued to increase with depth, with potential near-term opportunities and potentially value-adding inventories being left unmined. Planned LOM productivity rates were also materially higher than current performance, which required a robust strategy to fill the performance gap.
Optimizing value through a dynamic cut-off grade strategy
AFRY's more dynamic and flexible cut-off grade strategy ensures that near-term opportunities that had been left unmined in the upper mining areas could be included in the LOM plans. A lower cut-off grade at the higher-grade operations in the short term will allow greater operational flexibility in the LOM plan process to include near-term opportunities and contingency production when spare mining capacity is available without eroding value. Raising the cut-off in the long-term across all the mines when operating at full system capacity and steady-state production ensures the highest grade material is being mined in future.
Cut-off grades is a key lever:
- Moved away from break-even style cut-off grades calculations to a more flexible and dynamic cut-off grade strategy
- Reduced short-term cut-off grades at the higher grades mines to access near-term opportunities and contingency production to fill spare system capacity
- Increased cut-off grades long-term across all mines to ensure highest grade material is being mined when system capacity is full
The project resulted in adopting an optimized cut-off grade strategy that could unlock $0.7B in cash over the next 5 years and more than $1.0B in NPV, while providing greater operational flexibility and stability to close the performance gap without eroding value.