ALTRI - Sustainable textile fibre bio-factory
ALTRI - Sustainable textile fibre bio-factory
DANE PROJEKTU:
Time schedule: June 2022 - June 2023
Client: Altri SGPS SA and the public-private consortium Impulsa (Society for the Development of Strategic Projects of Galicia)

Project description:
This bio-factory will use Galician wood as the primary raw material together with recycled remains from the textile industry to produce dissolving pulp and Lyocell fibre. The plant will be designed based on the best available techniques (BAT), best environmental practices, as well as cutting-edge proven technologies and the production will be fossil-fuel-free.
Services:
Pre-engineering for the following - steel and pre-cast- buildings at ALTRI complex:
- Truck gate
- Main gate
- Office I
- Office II
- Fire
- Ambulatory
- Control room
- Lockers room
- Canteen
- Lyocell


Technical data
3d static calculations (seismic included) and 3d modeling, 2D drawings and design coordination.
Other information:
Used tools:
- 3d modeling – Tekla, Trimble Connect,
- 2ddrawings – Tekla, Trimble Connect,
- 3d static calculations – Autodesk Robot Structural Analysis.