KEBAG Enova modern waste incinerator
KEBAG Enova modern waste incinerator
DANE PROJEKTU:
Time schedule: July 2020 - July 2022
Client: KEBAG Enova
KEBAG Enova in Zuchwil, Switzerland – this is a modern waste incinerator project. It is a twenty-storey building with three underground levels.
The structure is designed in both cast-in-place concrete and steel frame technology.
Services:
The innovation of the entire project is that the construction work is partially carried out without the use of drawings - site engineers use the received IFC files to place the reinforcement. Simplified drawings of reinforcement were made only in the as-built phase of the project.
The service included civil design for phases: workshop and as-built.
Technical data
BIM2Filed – reinforcement 3d modeling
Other information:
Used tools:
-
3d modeling – Tekla, BIMCollab
Jesteś zainteresowany naszą ofertą? Skontaktuj się z nami
Kontakt do użytkownika Justyna Rojek-Klepacka
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.