![Stainless steel pipes in the factory. Construction on food production.](/sites/default/files/styles/hero_type_l_tablet_landscape_up/public/2019-11/Stanless%20steel%20pipes%20in%20factory.jpg?h=5823a141&itok=px02tdzu)
UPM SCHONGAU - NEW POWER PLANT
New Power Plant - UPM Schongau Combi Plus CHP Plant
DANE PROJEKTU
Project decision: March 2013
Test runs: March 2014
Taking over: December 2014
![PL_UPM Schongau GmbH_projeck](/sites/default/files/styles/text_and_image_full_560x480/public/2021-01/upm.jpg?h=324557ee&itok=fDwcoozd)
Areas of work
Cooling water intake building.
Turbine building.
- Gas supply system,
- Feed water system,
- MP and LP steam systems,
- Condensate system,
- Hot water system,
- Cold water system,
- Auxiliary Cooling system,
- Close cooling system,
- Compressed air system,
- Drainage system.
Pipe Bridges
- connections to/from the existing plant.